Company
Chevron Refinery
Location
Salt Lake City, Utah
Project
Loading Terminal
Services
Full Service – Design/Construct
Product
Oil & Gas
Capacity
12 Spot Railcar
Status
Completed in 2014/2015

Refined Product Output Increased with Customized 12-spot Loading System

Thanks to the cost analysis provided by Liquid Transfer Group, a crude oil refinery in Utah determined it was wise to invest in the design and engineering of a new pipe bridge and loading platform for their 12-spot loading facility. LTG was also able to create a demolition plan for the original loading platform which was originally built in the 1940s and overdue for an upgrade.

Delays and shortcomings on the part of the previous EPC contractor were easily remedied and the project was completed by LTG on time.

Implementation of the innovative, fully OSHA compliant design allows the customer to increase their refined product output to out of state facilities, filling the gap for those previously unable to gather adequate raw material for operations.

fa-file-pdf-o Download Case Study
Company
Chevron Refinery
Location
Salt Lake City, Utah
Project
Loading Terminal
Services
Full Service – Design/Construct
Product
Oil & Gas
Capacity
12 Spot Railcar
Status
Completed in 2014/2015

Refined Product Output Increased with Customized 12-spot Loading System

Thanks to the cost analysis provided by Liquid Transfer Group, a crude oil refinery in Utah determined it was wise to invest in the design and engineering of a new pipe bridge and loading platform for their 12-spot loading facility. LTG was also able to create a demolition plan for the original loading platform which was originally built in the 1940s and overdue for an upgrade.

Delays and shortcomings on the part of the previous EPC contractor were easily remedied and the project was completed by LTG on time.

Implementation of the innovative, fully OSHA compliant design allows the customer to increase their refined product output to out of state facilities, filling the gap for those previously unable to gather adequate raw material for operations.