Company |
USGD (USD Terminals) |
Location |
Hardisty, Alberta |
Project |
Loading Terminal |
Services |
Full Service – Design/Construct |
Product |
Oil & Gas (Crude) |
Capacity |
120 Railcars |
Status |
Completed in 2013/2014 |
Innovative Loadout Terminal Design Increases Production to 120-Railcar Unit Trains Per Day
USD Terminals knew they could rely on Liquid Transfer Group to design a ½ mile-long loadout terminal for their major crude oil hub in Hardisty, Alberta. The facility is also an origination point of export pipelines to the US.
LTG designed a fixed loading rack with 62 loading positions, unit train staging area, loop tracks, as well as control, operator, and mechanical buildings. Additionally, 31 boom supporting loading arms with supply and vapor management systems were engineered to accommodate up to two 120-railcar unit trains per day.
As an experienced EPC contractor in the Oil & Gas market, our customers know they can count on innovative design and engineering to increase production and safety to move their businesses forward.
Download Project Profile